DimaSimma Intralogistic Srl
Packaging and storage
ITItaly
11-50
10
< 10

Integrated logistics for steel tubes & pipes

Integrated logistics for steel tubes & pipes

There are many reasons to apply integrated logistics in the tube industry: - space saving: maximization of space and volume;
- time saving: quick access to stocks;
- customer service: inventory management and order preparation thanks to continuous tracking;
- improvement of delivery times and service: safety and ergonomics for workers, reduction of fatigue and human error.

A 50-year experience in logistics allows DimaSimma to meet the needs of manufacturers, distribution centres and end consumers.

The Italian company offers to steel and metals companies a wide range of logistics solutions, such as:
- automatic warehouses from 50 to 8,000 load units
- AGV vehicles operator-free;
- Automatic Stacker Cranes.

These handling systems can operate individually or interface among each other and with other operating machines by being integrated into the production flow.

Besides the quality and reliability of the machines, what DimaSimma can offer is an optimal management of the production flow and the development of customized solutions.

The DimaSimma systems fully comply with the INDUSTRY 4.0 technology.
All the handling operations, from production to the delivery, are carried out by using automatic warehouses, AGVs and automatic cranes that are connected to the factory management systems, in a continuous exchange and management and data.

The operations are executed automatically and simultaneously, without the intervention of operators, and by being able to trace the references at any time.
The bridge crane automatically stacks the tube bundles, which are taken from the AVG vehicle, that autonomously reaches the automatic warehouse.

When the layout of the factory allows it, the warehouse can be directly interconnected with the different process lines making it possible to achieve a full automation and reliable items traceability.

Dimasimma is pleased to announce that they will be present at the Tube in Duesseldorf from the 16th to the 20th of April 2018. Make sure you visit the company stand B21 in hall 6, where the company staff will be ready to great you and anwers all questions.

Tuesday, April 3, 2018